Hardscaping and landscaping on Kiawah Island.
On Kiawah the design is half the job and the paperwork is the other half. The Architectural Review Board reviews a fence, a patio, a driveway, a path light and a square of turf before any of it goes in, and the Town adds a permit of its own. We read both sets of rules for your lot before we give you a number.

- Area
- Kiawah Island, SC
- Who reviews the work
- Kiawah Island ARB and the Town
- You hear back
- The day you call
What the review board decides before we dig
Almost everything outdoors needs an ARB permit. The board's standards, Designing with Nature (the 2026 edition, posted in September 2026), put fences, walkways, driveways, seating areas and landscape lighting through its review.
The application carries a review fee, a deposit and an agreement form, and the board's own answers page says the form is signed by both the contractor and the owner. The board generally meets on the first and third Wednesday of the month, and its standards say a permit is issued within ten business days once the submittal is complete.
Fences are short, dark and hidden. Five feet is the ceiling, post caps and lights included. An open fence has to sit at least ten feet off the property line and outside the stormwater buffer, which is typically fifteen feet from a marsh or lagoon edge.
It is to be simple and dark, with evergreen planting screening it, and chain link is not allowed. On lots whose side and rear setbacks are ten feet or less, the standards let a fence sit five feet from the line with enough evergreen planting between. The Town's code asks for a zoning permit as well.
Hard surfaces come out of a budget. Lot coverage, the house footprint included, is capped by the lot's high ground: 55 percent under 8,000 square feet, 46 percent from 8,000 to just under 12,000, and 39.67 percent at 12,000 and over. Driveways, walkways and at-grade seating areas are all drawn on the plan the board reviews.
A seating area at grade stays at least ten feet from the property lines and outside the same stormwater buffer. A driveway stays five feet from a side line, light-colored or attention-getting paving will not be approved, and plans for new or replacement hardscape go to the community association for a drainage review before construction.
Turf is possible, out of sight, with samples. The standards allow artificial turf for a lawn only after the board has reviewed and approved samples. It counts toward lot coverage, and it is not allowed in a right-of-way or where neighboring properties can see it. The Town's own landscape code calls synthetic turf discouraged. Where you want real grass, it has to be sod; seeding and sprigging are not accepted.
The island sets the working day. A contractor needs a Town business license, a community association encroachment permit and a gate pass before the first truck comes through. Work runs Monday to Friday, 7 to 7, and Saturday, 8 to 5, with no Sundays or national holidays. On the beachfront, lights may not shine toward the beach in loggerhead season, May 1 to October 31, and on a house lot the board does not allow motion-sensor lighting.
Rules checked in October 2026 against: Kiawah Island ARB, Designing with Nature (2026 edition) · ARB frequently asked questions · Town of Kiawah Island, business licenses · Kiawah Island Community Association, livability and encroachment permits · Town of Kiawah Island, Lights Out for Turtles. Boards and councils change them, so we confirm the current text for your address before quoting.
- Fence height
- 5 ft maximum, caps included
- Fence and seating setback
- 10 ft from lines; about 15 ft from marsh and lagoon
- Lot coverage
- 39.67% to 55%, house included
- ARB meets
- 1st and 3rd Wednesday



What Kiawah owners ask first.
Can I put artificial turf on Kiawah Island?
Only where the board approves it. The 2026 ARB standards allow artificial turf for a lawn after the board reviews samples, count it toward your lot coverage, and do not allow it in a right-of-way or where neighboring properties can see it.
How tall can a fence be on Kiawah?
Five feet, measured to the top of any post cap or light. An open fence also has to sit ten feet off the property line and outside the stormwater buffer, typically fifteen feet from a marsh or lagoon edge, in a dark simple style with evergreen screening. Chain link is not allowed.
What does a contractor need before working on the island?
An ARB permit for the job, a deposit and agreement form signed by you and by us, a Town of Kiawah Island business license, a community association encroachment permit and a gate pass. We apply for those before the first day; the ARB, the Town and the community association issue them. Work stays inside the island's hours: weekdays 7 to 7, Saturdays 8 to 5.
Tell us the Kiawah Island address.
You get a real figure the same day, and we will tell you what is driving it. If your property needs more than we quoted, you hear that before anyone starts, not after.
What we build on Kiawah Island.
We also work in North Charleston · Mount Pleasant · James Island · West Ashley · Johns Island · Summerville · Daniel Island · Isle of Palms · Sullivan’s Island · Folly Beach · Downtown Charleston.